Use a drywall knife to fill the large gaps with ready mixed joint compound.
1 drywall floor gap.
Some places leave 1 2 so that water from floor scrubbing can t contact the drywall and wick into it.
This gap will be covered by baseboard molding.
It s preferred that there be a 1 2 inch gap between the bottom of the lower drywall panel and the floor since this allows room for seasonal expansion and contraction of the drywall and prevents buckling.
I m looking to put new drywall up but i wanted to know if it was possible not to have a gap between the drywall and the floor as my preference is to not use trim on this project.
Gap at edges right.
The baseboard will cover it later.
In fact when you re hanging the ceiling keep in mind that 1 2 in.
It also helps prevents moisture wicking if the floor floods.
So you can safely cut these pieces 1 4 in.
With patience the right tools and a.
There should be a slight gap between the floor and the drywall so that the drywall won t jam against bumps in the floor.
The trim will cover any gaps so it s not critical that these are even.
Cut it to leave about a 1 8 in.
Less than the actual measurement and leave a gap in the corner if necessary.
This allows for floor and wall expansion without cracking the drywall.
Hi there i m remodeling my home out in austin where the insulation was removed to address pest and mold issues.
Always leave a 1 2 inch gap at the floor.
Allow the joint compound to dry until it s white or according to.
1 2 give or take is fine just be sure there s no direct contact that can wick up moisture.
If there is any settling or shrinkage in the framing the 1 4 gap absorbs it without crumbling the drywall.
Along the perimeter will be covered by drywall on the walls.
And the same is true of inside wall corners.
The drywall was mainly removed along the exterior walls up to the 4 high mark and sometimes 8 tall.
If necessary trim the sheet to leave a half inch gap.
You are now ready for the taping and mudding crew to do their work.